Skip to main content
A ride-on floor scraper peels glued-down wood planks off a concrete slab in an open living area

Wood Floor Removal

Hardwood Floor Removal in Dallas–Fort Worth

Glued to the slab, nailed to plywood or stapled down: we take solid hardwood up with a ride-on floor scraper, clean off the glue and fasteners, and hand your installer a floor that's ready.

Quick answer

Dust Kingz removes solid hardwood floors across DFW. Most of the floor comes up with a battery-powered ride-on scraper instead of hand tools, then we clean off leftover glue, nails and staples. Hardwood is quoted from photos or a walk-through, with a $3,000 job minimum. Call (817) 694-4784.

Why a ride-on scraper changes the job

Pulling hardwood by hand is slow: pry a board, split it, pry the next. Our ride-on floor scraper weighs about 2,600 pounds, runs on batteries (no exhaust indoors), and drives a 12-inch blade under the boards. On a glued floor it shears the wood and most of the adhesive off the slab in long passes. The crew follows behind to clear debris, handle the edges and closets by hand, and load the trailer as they go.

The result is a faster job, fewer hours of noise in your home, and a slab that needs less grinding afterward.

What's included

  • Glue-down hardwood on slab, nailed or stapled hardwood over a wood subfloor
  • Parquet and older strip floors
  • Glue scraped off and, where needed, ground down with HEPA dust capture
  • Nails, staples and tack strip pulled or set flush
  • Baseboard removal and labeling on request
  • Haul-off and disposal the same day

Glued, nailed or stapled: what each means for you

Glued to a slab. The most common setup in newer DFW homes. The boards come up quickly with the scraper; the glue left behind decides how much cleanup the slab needs.

Nailed or stapled to plywood. Common in older homes and second floors. The boards come up cleanly, but every fastener has to come out or be set flush before the next floor goes down.

Engineered or floating floors. See our engineered wood floor removal page.

What it costs

We don't publish a per-square-foot rate for hardwood because the glue, the subfloor and the layout change the work more than the square footage does. Send photos of the floor, a close-up of a board edge or transition if you can, and the approximate square footage. You'll get a written quote. Every job has a $3,000 minimum. For tile, see our tile removal cost guide or the cost calculator.

Who calls us for hardwood

Homeowners swapping worn hardwood for new wood, LVP or tile. Flooring companies who want their installers on a clean slab instead of a demo site. Remodelers and general contractors who need the floor gone before the next trade shows up.

Service area

Fort Worth, Dallas, North Richland Hills, Keller, Southlake, Colleyville, Grapevine, Plano, Frisco, McKinney, Irving, Arlington and the rest of the DFW metroplex.

Hardwood Removal FAQ

How do you remove a glued-down hardwood floor?
Most of it comes up with our ride-on floor scraper: a battery-powered machine of about 2,600 pounds with a 12-inch blade that drives across the room and shears the boards and most of the glue off the slab. Edges, closets, doorways and stairs are finished by hand, then any glue left behind is scraped or ground off.
Can you remove nailed or stapled hardwood over a wood subfloor?
Yes. Nailed and stapled floors are lifted and every leftover fastener is pulled or set so the subfloor is smooth for the next installer. Tell us if the subfloor itself has soft spots; repairing it is a separate scope we'll flag at the walk-through.
How much does hardwood floor removal cost in DFW?
Hardwood is priced from photos or a walk-through because the attachment method, glue type and room layout change the work so much. Every job has a $3,000 minimum. Send photos and square footage and we'll give you a written number.
How long does it take?
With the ride-on scraper, a typical 1,500 to 2,500 sq ft home is usually done in a day for the boards. Heavy glue cleanup, stairs or a wood subfloor can add time; we'll tell you the schedule up front.
Is the dust controlled?
Scraping boards makes far less dust than grinding. When the slab needs grinding to clean up glue, we grind with a shrouded tool tied to a HEPA dust extractor so the dust is pulled in at the blade.
What about the stairs?
Hardwood treads and risers are removed by hand. Stairs are priced by the step at the walk-through.

Plan the handoff from glued flooring to the next installer

Share which rooms have wood flooring, how it is attached if known, and what you plan to install next. Photos of the floor and its transitions help identify questions for the estimate.

Removal and adhesive cleanup are separate from confirming that a substrate meets the selected flooring system’s requirements. Ask your flooring installer to confirm any moisture testing, repairs, leveling, or other preparation still needed.

  • Identify the material and approximate area in each room, including mixed flooring.
  • Agree which baseboards, cabinets, adjacent floors, and access paths must remain protected.
  • Confirm removal, adhesive treatment, haul-off, cleanup, and the handoff condition in the written scope.

Hardwood coming up?

Send photos for a written quote anywhere in DFW.

NARI Member — Remodeling Done Right

Proud Member of the National Association of the Remodeling Industry

What NARI Membership Means →